LCIP LX4 - Covent Lane Borenore

SJM Rail delivered signalling construction works as part of the Level Crossing Improvement Program (LCIP) at Convent Lane, Borenore, NSW.

The works involved the installation and upgrade of signalling infrastructure associated with the level crossing, including site construction, testing support and integration with the existing rail network.

The project was delivered in accordance with rail safety, quality and technical requirements, with SJM Rail coordinating works within the operational rail environment to support the successful delivery of the level crossing upgrade.

LCIP LX4 Borenore.JPG
1685690869465.jpeg

Port of Melbourne – Phase 1 & 2

Client: Port of Melbourne
Location: Victoria, Australia
Service: Signalling Services
Status: Completed Phase 1 2024 & Phase 2 2025 

Port of Melbourne plays a critical role in Australia’s supply chain, handling more than one-third of the nation’s container trade. As part of its major infrastructure upgrade, SJM Rail was engaged to deliver the signalling works across Phases 1 and 2.

Our scope included the design, installation and commissioning of rail signalling systems across key freight corridors, including replacement of legacy equipment and integration with existing infrastructure.

Working within a live operational environment, our team delivered the works to strict safety and scheduling requirements while minimising disruption to port operations. The project demonstrates SJM Rail’s capability to successfully deliver complex signalling works within high-traffic infrastructure

Port of Melbourne – Phase 1

EASTERN SUBURBS RAILWAY

As part of construction works for re-railing and improving track acoustics in the Eastern Suburbs Railway, SJM Rail Signalling provided support works across the Easter 2018 weekend.

 

This included the design and fabrication of plates to elevate Pneumatic Train Stops to the new track height, and to provide all testing and commissioning, including cleaning and routine maintenance of all Signalling Apparatus in the affected areas.

Eastern Suburbs Railway

MORTDALE MAINTENANCE CENTRE

To accommodate the introduction of the New Intercity Fleet SJM Rail Signalling was commissioned to relocate new rail systems into roads 2 and 3 within Mortdale Maintenance Centre. 

Works included modifications to the existing pantograph system along with introduction of new 1:12 turnouts to allow movements in and out of the facility.

MT OWEN

Existing turnout infrastructure within the Hunter Valley Corridor has been renewed in the 2017 annual works program. 53 points on the Up Main at Mt Owen in the Hunter Valley Region of NSW was renewed with a 60Kg Head Hardened, 500 radius 1:15 Swing Nose Layout. SJM Rail undertook the renewal works planned for these points. This entails booking out of equipment, removal and reuse of certain point components, rebuilding point layouts, and testing and certification of all altered works.

Mt Owen

ARTC HUNTER VALLEY

MAITLAND TO TELERAH

Installation at Farley 420B project enabled the SJM Rail Signalling team to deliver all signalling aspects for the first 60KG Tangential turnout Spherolock in front Inbearer and back drive installation onto the Hunter Valley network. These works also included new pit and pipe trenching along with relocation of signalling infrastructure.

All pre works, installation, testing and commissioning works were performed by the team who worked hand in hand with nominated track and civil companies.

ARTC Maitland

ARTC HUNTER VALLEY

Within our multidiscipline and flexible team at SJM Rail Signalling, we have undertaken all signalling works in partnership with numerous Track and Civil contractors on delivery of strategic track upgrades on the Hunter Valley Network. These works include but not limited to, Track Re Railing, Track recon, Drainage profiling, Installation of new Insulated Block Joints, resleeping, Turnout replacement and signal and point relocations. Locations on delivery such as Coggen Creek, Widden Creek, Sandgate and Wollar shows SJM Rail Signalling can deliver in remote areas to the suburban networks.

ARTC Hunter Valley

TAS RAIL TASMANIA

The SJM Rail Signalling team attended Tasmania and assisted in the development of the Tas Rail team to deliver installations of 1 in 8  Trailable Points on 50kg with timber bearers.

The first installation at Bocco Siding was fully installed by the team at SJM Rail Signalling with training and advice on best practices given to members of the Tas Rail team.  

TAS Rail

We deliver design on time and within budget for each stage of a signalling projects life.